21 NCAC 56 .1710             DUAL licenseEs

The number of PDH units required shall remain the same for persons who hold a second license as engineer or land surveyor. Holders of a second license must obtain a minimum of one-third of the total PDH requirements in each field. The remaining one-third requirement may be obtained in either field at the sole discretion of the licensee.

 

History Note:        Authority G.S. 89C-10(a); 89C-17;

Eff. December 1, 1994;

Amended Eff. July 1, 2009;

Pursuant to G.S. 150B-21.3A, rule is necessary without substantive public interest Eff. April 27, 2019.